Well happy St. Patrick’s Day to you too…
…and setting the last two corner beams.
Ej and i are truly blessed, and our constant prayer is that the Father would keep us faithfully satisfied with Him alone.
Well happy St. Patrick’s Day to you too…
…and setting the last two corner beams.
Ej and i are truly blessed, and our constant prayer is that the Father would keep us faithfully satisfied with Him alone.
Good News:
Today they took the forms off, everything looks good. There is going to be quite a bit of dirt work to do a little later on down the road…i really wish i had a tractor… Ah, well one step at a time, i suppose borrowing one will have to do for now.
Bad News:
In all, three trees had to come down, two crate myrtles that were older than me, and lastly this guy. I hate losing trees, for me it’s almost like losing a pet, but alas, we had to remove them. The other two big ones will have to be trimmed back but i believe we will be able to keep them around.
More Good News:
Today i got to walk on the thing so thats pretty cool.
Yes that’s right i am posting twice in one day… Today’s earlier post was from this morning before any of the laborers arrived and now at the end of the day we basically have all of the plumbing in the slab ready to go… They (the plumbers) will come back out tomorrow morning (Wed, March 3rd) and do a pressure test and tie the line into the septic and then put the plastic back on so the steel guys can set their beams in the trenches. Then (drum roll please) Thursday morning at 7 am, concrete is scheduled. Honestly, i can’t really believe it is happening this fast. My wife says i am a pessimist but i think of myself as more of a realist, she says that must mean she is a dreamer if optimism isn’t reality (she is right next to me saying these things, she kind of has a point but i still don’t totally agree, i think i am pretty optimistic.) Nonetheless, this is what is happening…and just happened.
It has been so stinkin’ wet here and the weather prophets say much more is on the way so the workers are kicking it into high gear and wanting to accomplish much before monday. We are now ready to plumb this bad boy and put the steel in the trenches… I must confess, when this part is over i will be very, very relieved.
Just a little side note, Ej’s in week 12 so these next few weeks (12-14) God will begin “laying the pipes” on our little one, in other words, “it” will become a he or she!
Today we got to see and hear the little one for the first time, it was pretty amazing to hear and watch the heart beating. Thank you God for your good gifts. Just in case you want to hear it too, you can click here.
It also snowed today so there was no new progress on the house…